Development timeline

Updated 13 November 2026. Project overview · Forward roadmap · Release status

This history separates design decisions, local prototypes, physical observations and public releases. A dated prototype result does not automatically describe the downloadable alpha. Historical dates come from reviewed project notes and public Git history; future windows are proposals unless a platform-confirmed launch date is stated.

The journey so far

Date Milestone What changed and why Evidence/status
19 August 2026 Early OpenPromptlet control-deck brief Explored a screen-free USB controller with RGB buttons, mechanical command keys and a push encoder. The purpose was to make AI tools and repeatable actions physical. Historical design brief; an earlier hardware concept, not the current 30-key specification.
6 November Round-display gallery published OpenDotlet initially described the Waveshare ESP32-S3 round-screen gallery. Pinned dependencies, deterministic artwork export, firmware checks and setup documentation made the experiment reproducible. Initial public source and clean-checkout build record.
6 November Artwork orientation corrected Individual blue/cyan smile views gained upright U-shaped eyes in both themes. Asset checks protected orientation and unchanged frames. Public correction; this verifies gallery artwork, not a keypad or voice session.
6 November Early local voice-button experiment A USB microphone/local-transcription experiment was exercised with a spoken phrase. This contributed reusable companion work. Historical local prototype evidence; speech capture is not included in the public saved-task alpha.
7 November Task keys and agent feedback explored Codex Micro research informed the idea of a distinct task/agent function per key and lighting that communicates state. Existing companion/agent work was investigated for reuse. Research and development direction; 30 independent concurrent agents were not established.
9 November Provisional console parts list The public repository added a console BOM to make hardware exploration more concrete. Parts-list commit. Provisional exploration, not an accepted current keypad build package.
10 November Four-knob controller exercised The separate control brick's four encoders and push buttons were physically accepted on its prototype. Reported in the public OpenPromptlet build repository. Separate from keypad acceptance.
12 November Modular direction proposed The combined device became two independently useful modules that could eventually attach. Round-display orientation and all four knobs were reconfirmed on the controller prototype. Design discussion plus the controller's published status. Mechanical attachment remained open.
13 November Product names and boundaries clarified Open.Dotlet became the 30-key keypad/prompting tablet. OpenPromptlet became the four-knob round-screen controller. Each coloured face became a “dotlet”: an assignable entry point to a saved task. Current product decision. Shared task state and physical/electrical attachment were not declared finished.
13 November All 30 key positions tested The C6 keypad diagnostic registered press/release positions and illuminated keys while held. Physical prototype test with user confirmation; this did not by itself prove prompt execution.
13 November First physical saved-prompt run The white-logo key sent a fresh event through the Windows serial client to the Mac saved-task service. A real read-only project-summary response returned and was shown in the app. Development setup demonstrated end to end. One starter binding was assigned; repeated/held events were constrained.
13 November Agent team workspace The illustrated 6×5 map, selected task, progress and history were brought together. A later physical run completed and the view followed its running/completed states. Native development interface observed; “team” describes task bindings here, not automatic agent delegation.
13 November Public identity and landing page Neutral black/white styling and green accents replaced the coral-led direction. The product image, source links, setup requirements and module relationship were simplified at opendotlet.com. Public landing page deployed; actual photo with AI background removal.
13 November First portable Windows alpha A standalone Windows launcher, bundled Python and local browser interface were built and published as alpha.1. Source was retained under its release tag. Historical alpha.1 release; that original Windows artifact was unsigned.
13 November Mac notarization and alpha.2 The Mac helper was packaged as a standard nested app, signed and submitted to Apple. Notarization was accepted; ticket stapling, Gatekeeper and distribution checks passed. Public alpha.2, Apple Silicon/macOS 14+; validation summary.
13 November Windows publisher signing The existing HeySalad Azure signing account signed the tested launcher as HeySalad Inc. Windows trust, timestamp and fresh-state runtime checks passed. Signed downloads and checksums went live. Signed alpha.2 asset; 1,004 dependency/UI files matched the CI payload. Remaining USB/provider test is explicit.
13 November Launch materials and scheduling Product image, app gallery, maker story, setup/source links and platform availability were saved on the existing Product Hunt product. Product Hunt confirmed Scheduled for 14 November, 08:01 GMT / 00:01 PT. Scheduled is distinct from a live launch.

What happened inside the 13 November milestone

The order matters because it keeps a working device from being mistaken for a fully released product:

  1. Validate inputs. Test every row/column position and distinguish a key's electrical position from its photographed orientation. The white-logo starter key is matrix row 5, column 6 on this build.
  2. Prove one useful action. Bind a small project-summary prompt with read-only access. Show a real result before expanding the action system.
  3. Make that action understandable. Match the app's faces to the physical pad and keep the selected task, progress, errors and result together.
  4. Keep the interaction deliberate. A fresh press starts a task; a held key or repeated event should not repeatedly submit work. Only one task runs at a time in the alpha.
  5. Remove development-machine dependencies. Package the local runtime/Python and verify that a user does not need the original checkout. Keep Codex CLI/account setup explicit.
  6. Establish distribution trust. Separate a successful build from Apple acceptance, Windows publisher signing and public download checksums.
  7. Invite testing with accurate claims. Release the saved-task alpha and show what remains experimental. Preserve the earlier gallery and separate controller work without presenting every experiment as part of the download.

The product decisions behind the timeline

A modular product

A keypad and an encoder/display controller have different jobs and build constraints. The split makes it possible to test each on its own. A connection between them is a future milestone with mechanical, electrical, firmware and task-state acceptance criteria; it is not just a naming change.

A dotlet starts as a task binding

The first reliable building block is a saved prompt plus a chosen project. A workflow, function or specialized agent can later use that same physical entry point, but needs a clear execution contract, permissions, cancellation and feedback. The current release keeps the saved read-only path as its baseline.

Software before a hardware purchase

The on-screen Run task path lets people test the idea before sourcing a keypad. This is why signed downloads, clear Codex setup and good error messages are ahead of additional hardware features in the roadmap.

Proposed next timeline

Window Focus Observable outcome before moving on
14–20 November Launch feedback, setup and reliability Fresh Mac/Windows setup reports, reproducible issues, complete physical tests and documented reconnect behavior.
21–27 November Key assignments and feedback Reliable editing/learning of mappings, accessible status/result handling and configuration recovery.
28 November–11 December CLI, local extension contract and bounded workflows Versioned invocation API, portable read-only examples, cancellation/error behavior and duplicate-execution tests.
12–25 December Chrome extension and API-key mode, as separate acceptance tracks Browser-to-local authorization checks; keys retained by the trusted host; explicit execution and usage boundaries.
26 December–8 January 2027 OpenPromptlet task feedback and modular hardware Agreed protocol, real status shown on the controller, both modules still useful separately, repeatable fit/wiring evidence.
9–22 January Beta readiness Supported configurations, fresh-user acceptance, complete licence/build documentation and no unresolved critical execution/recovery failures.

These are indicative planning windows, not fixed release commitments or work already completed. The detailed roadmap lists dependencies, deliverables and exit checks. A failed safety, recovery or physical test moves the next milestone rather than being hidden by a date.

How this page will be maintained

Completed entries should link to a release, source change, test record or clearly described physical observation. Record the configuration and limitation beside the result. Future work moves to completed only when its acceptance criteria pass; a mockup, CI build or serial acknowledgement alone is insufficient proof of a physical result.

The older round-display roadmap remains available as historical context. Its voice/image experiments are not silently promoted into current keypad features.